Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

项目状态 Updates

公共工程 Ian Projects

Hurricane Ian Projects

Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Bayshore Live Oak Park - West Fishing Pier

Bayshore Live Oak Park - West Fishing Pier

Last Updated: 06/24/2024 Category: Parks And 娱乐 当前阶段: Planning and Project Approval

Total replacement of the western 钓鱼码头 at Bayshore Live Oak Park.

阅读更多

Sandhill Blvd Widening

Sandhill Blvd Widening

Last Updated: 06/24/2024 类别:巷道 当前阶段: Planning and Project Approval

Sandhill Blvd Widening

阅读更多

Kings Highway Widening 欧博体育官网 Image

Kings Highway Widening

Last Updated: 06/24/2024 类别:巷道 当前阶段: Design Development

Widen Kings Highway to a 4 lane divided roadway

阅读更多

Charlotte Harbor CRA - Parmely Street road widening and sidewalk 欧博体育官网 Image

Charlotte Harbor CRA - Parmely Street road widening and sidewalk

Last Updated: 06/24/2024 类别:巷道 当前阶段: Design Development

Reconstruct and widen Parmely Street from U.S. 41 to Bayshore 路.

Construct multi-use path on Parmely Street from U.S. 41 to Bayshore 路.

阅读更多

Charlotte Harbor CRA - Melbourne Street multi-use path 欧博体育官网 Image

Charlotte Harbor CRA - Melbourne Street multi-use path

Last Updated: 06/24/2024 Category: 人行道上 当前阶段: Design Development

Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview 路.

阅读更多

Bissett公园

Bissett公园

Last Updated: 06/24/2024 Category: Parks And 娱乐 当前阶段: Planning and Project Approval

Creation of park master plan and phase 1 development

The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, 钓鱼码头, 野餐避难所, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season. 

阅读更多

Myakka公园 欧博体育官网 Image

Myakka公园

Last Updated: 06/24/2024 Category: Parks And 娱乐 当前阶段: Planning and Project Approval

Creation of a master plan through the park design process and phase 1 development.

阅读更多

贝蒂湖公园

贝蒂湖公园

Last Updated: 06/24/2024 Category: Parks And 娱乐 当前阶段: Planning and Project Approval

Park master plan for 贝蒂湖公园

Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, 野餐展馆, 行走路径, and an improved parking lot.

阅读更多

Peachland Boulevard at Harbor Boulevard Intersection Improvments 欧博体育官网 Image

Peachland Boulevard at Harbor Boulevard Intersection Improvments

Last Updated: 06/24/2024 类别:巷道 当前阶段: Design Development

The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.

阅读更多

Delivering Exceptional Service

问题? 问题?

欧博体育